Alligator River Bridge on U.S. 64 to Close for Repairs March 14-21
Published 9:57 am Wednesday, February 14, 2018
Traffic will be detoured to N.C. 94, U.S. 264, U.S. 17 and U.S. 158
RALEIGH – Beginning Wednesday, March 14, the North Carolina Department of Transportation will close the Alligator River Bridge between Tyrrell and Dare counties for one week. The closure will allow crews to complete major renovation work on the bridge’s swing-span drawbridge.
The bridge will be closed to all vehicle traffic at 12:01 a.m. on Wednesday, March 14 and is expected to reopen by 11:59 p.m. on Tuesday, March 20. The drawbridge will also be closed to boat navigation. During the closure, crews will complete the electrical and mechanical swing span repairs that were started during the previous bridge closure Jan. 10-17.
The work is part of an extensive renovation project designed to extend the life of the 58-year-old bridge. The $16.7 million contract was awarded to Flatiron Constructors of Morrisville, NC back in March 2017.
During the closure, NCDOT will have detour signage and variable message signs in place to guide motorists through the following detour routes:
- Motorists traveling east from Columbia should use N.C. 94 South to U.S. 264 East to U.S. 64.
- Motorists traveling west from Dare County to Columbia should use U.S. 264 West to N.C. 94 North to U.S. 64.
- Motorists traveling to the Outer Banks from areas west of Williamston should use U.S. 17 North to U.S. 158 East.
- Motorists traveling from the Outer Banks to points west of Williamston should use U.S. 158 West to U.S. 17 South to U.S. 64 West.
No additional bridge closures are expected during the renovation project.