North Boundary Canal Update
Published 1:15 pm Tuesday, October 9, 2018
North Boundary Canal on both sides of North Road Street in Columbia was dammed and pumped on Oct. 1 so a larger culvert can be installed to aid in stormwater runoff beneath North Road Street. The street was closed Oct. 3, perhaps for up to six weeks.