North Boundary Canal culvert
Published 4:40 pm Monday, November 12, 2018
Metal rods maintain the integrity of the huge culvert installed Nov. 8 in North Boundary Canal in Columbia to provide better storm water runoff. A sidewalk will be poured at the bottom level of the handrail at right, a welcome addition for pedestrians using North Road Street.